Are the steel structure connections site bolted or welded?
- Share
- Issue Time
- Jul 10,2019
Are the steel structure prefabrication workshop connections site bolted or welded?
All site connections are bolted. ,which reduces the site installation time . All parts of the steel structure are
prefabricated in the factory.
All steel structure workshop warehouse frame are welding in Workshop.
All the steel structure workshop warehouse prefabrication buildings are installation on site by bolt.