SERVICE FAQ
All
SERVICE FAQ
PRODUCT FAQ
COMPANY FAQ

SERVICE FAQ

How to load and deliver the steel structure warehouse workshop building materials?

China prefabricated steel structure warehouse workshop construction materials

How many main steps of the steel structure warehouse workshop construction?

1,steel structure building (steel structure warehouse workshop) foundationwork2,Mainsteel structure installation(STEEL STRUCTURE COLUMN ,STEEL STRUCTURE BEAM)3,Walland roof purlin installation4,Prefabricated steel structure Bracinginstallation5,walland roof panel installation6,Doorand windowsFinish

Do you provide the steel structure warehouse workshop supermarket school office dormitory design?

ZYM is a professional  steel structure manufacturer ,we provide complete design plans. If you want to know more , pls check the design service.https://www.steelstructure-building.com/oid1744216/Design-System.htm steel structure workshop warehouse building office hospital design 3D design and steel structure frame design of the supermarket hospital dormitory warehouse workshop office 

What is the disadvantages of steel structure ?

Even the The steel structure is heat-resistant and non-flammable;It is easy to rust and has poor corrosion resistance.But you need to use good paint or galvanized steel structure frame,or it will be easy to be rusty.ZYM has good steel structure design team and steel structure engineer suggestion service, professional steel structure installation team help you to solve all the problem.Read More How To Prevent The Corrosion Of Steel Structure

What is your terms of payment ?

What is your terms of payment ? Payment 30% in advance by T/T for deposit,the 70% balance before shippment by T/T or L/CFor further information feel free to contact us

What if the steel structure components are damaged during delivery

ZYM do everything in every detail with our heart . When packing and delivery the steel structures ,ZYM will protect them from the collision . If the steel structure parts are damaged , we will renew it for free . Read More Packing and Delivery For further information feel free to contact us

Do you provide the after-sale service if we have some problems?

Absolutely! We will track your project and provide the technical and team support. Maintenance and service of steel structure workshop warehouse buildings as follows: Maintenance of steel structure workshop:1. The warehouse of steel structure workshop is connected with the whole steel structure. The owner arranges electric lighting equipment. The wires can not be directly bound on the steel structure, but should be isolated and installed with conduit or trunking to avoid electric shock.2. The steel structure components of the steel structure project should be painted and maintained again after 3 years, so as to extend the overall appearance and service life of the steel structure workshop warehouse.3. We have installed many steel structure projects in Africa, South Africa, Malaysia, Thailand, Indonesia, Tanzania and Angola. After the warehouse of steel structure plant in UAE, Saudi Arabia, Oman, Kenya, Nigeria and benkina Fasso is installed completely, we all require the owner not to change the structure without authorization, not to dismantle any bolt components, not to add or reduce partition walls. If it needs to be changed, it can be changed after consulting with the steel structure manufacturing company.Maintenance of steel structure workshop:1. The steel structure workshop must be cleaned and maintained regularly. Generally, routine inspection should be carried out at least once a year to find potential problems.2. If the metal plate surface of the steel structure workshop is damaged, it should be repaired in time to avoid corrosion of the metal plate surface in the sun and rain. If necessary, all the high elastic nano materials are used to protect the metal roof panel, and play an effective role in heat insulation and waterproof, saving indoor air conditioning energy.3. The external wall cleaning of steel structure workshop depends on the environment (traffic density, air pollution, industrial pollution, etc.) to a great extent. When cleaning the surface, it is necessary to pay attention not to scratch. For the maintenance of steel structure, it is necessary to avoid the use of bleaching components and abrasive washing products. Steel balls and wear-resistant products are not allowed to be used. Clean water is used to wash them from top to bottom.4. The branches, leaves and other similar objects should be cleaned up in time.

How long is the delivery ?

The shortest lead time nationwide is 20 days .We will arrange the delivery as soon as possible .

Can you give a turnkey project?

Of course.It is our advantage to provide one-stop service ,we will design ,manufacture,and erect the project.Set your hearts at rest! 

How long does it take to build a steel structure building?

It depends on the size of the building.For example , It takes only 20 days to build a steel structure of about 1000 square meters.

What should I provide to build a steel structure building?

So easy! If you have the sketch drawing ,it will b a better reference for us. If not , don’t worry about it . Pls simply notify us your requirements, such as the area, usage and the storeys of the house. Before long, you’ll possess an amazing design.

Can you make design according to our requirements?

 Absolutely!We will provide you full-set design, not only the sketchup,3D model design ,but also the CAD design,and landscape design.One-stop service is our outstanding superiority with no doubt. steel structure design design