prefab warehouse
- Model
- ZYM1
Item specifics
- Name
- Indonesia steel structure warehouse workshop
- Key word
- Indonesia steel structure workshop with office
- Design
- 3D max,CAD for steel structure frame
- Material
- Q235,Q345B,SS400 steel structure
- Foof
- Galvanized color sheet or sandwich panel
- Wall
- Galvanized sheet for steel structure workshop
- Place of project
- Indonesia steel structure workshop and warehouse
- Delivery time
- 30 days after steel structure drawing confirmation
- Package
- Steel structure frame pallet for 40HQ container
- Application
- workshop,warehouse,office,commercial bulding,shop
Review
Description
ZhengYuanming Construction Engineering Co., Ltd. who has been becoming the leading company of Steel Building Construction & Steel Fabrication products. Qingdao ZhengYuanming is one-stop manufacturer of warehouse building,Prefab Portal Steel Structure Warehouse,Industry Steel Structure Warehouse,prefabricated warehouse,two story steel structure workshop warehouse,2 story steel building homes,windows and doors, fasteners with well-equipped testing facilities and strong technical support. our products have entered into many foreign countries like the SwitzerlandThe ZhengYuanMingTeam Group is a leading international steel structure manufacturers with 20+ years of group experience in prefabricated steel material production,+126,000㎡steel structure building construction in service.
Product name |
prefab warehouse |
---|---|
Brand Name |
ZYM |
Material |
Low alloy steel plate,Color paint,Wen steel plate: etc |
Brand |
ZYM prefab warehouse Manufacturer |
Keyword |
steel structure building contractor,High quality steel structure warehouse ,Steel Structure Building Workshop,professional steel structure warehouse,steel parking structure |
Material |
Q235,Q345B,SS400 steel structure |
Delivery time |
30 days after steel structure drawing confirmation |
Certificate |
PHI,TUV,BV,CE etc. |
Package |
Steel structure frame pallet for 40HQ container |
OEM&ODM |
YES |
Application |
OEM Steel Structure Warehouse,pre engineered steel structure warehouse,steel structure warehouse manufacturer,storage steel structure warehouse,small size steel structure warehouse |
FOB port |
Qingdao Guangdong Shanghai |
Terms of Payment |
L/C, D/A, Western Union, T/T |
FOB port |
Qingdao Guangdong Shanghai |
Processing Service |
Bending, Welding, Cutting, Punching, Pre-assembling, Painting |
Project Solution Capability |
graphic design, 3D model design, total solution for projects |
Main Materials |
light steel construction |
Color |
Request, colorful |
Design Style |
Modern |
Characteristics |
Safe foundation, anti-seismic and windproof |
Sales country |
Europa Island,Poland,Romania,Madagascar,Eritrea |
Prefabricated workshop
Structural form: Three story steel structure frame engineering
High quality made in China prefab warehouseBecause The steel structure system has the advantages of light weight, factory manufacturing, quick installation, short construction period, good seismic performance, fast investment recovery and less environmental pollution. Compared with reinforced concrete structures, it is more "high, large and light". prefab warehouse services FAQs GuideAre you looking for a quick review guide about prefab warehouseservices?An ultimate FAQ buying guide is available to help you.This guide contains all the information about all the important facts, figures, and various processes regarding prefab warehouse services.Let’s continue!
2.How does the weight of a steel structure building affect site preparation and construction?
3.What certifications do your products have?
4.Do you offer service for installation?
5.How do prefab warehouse compare in terms of sustainability and green building standards?
6.What type of maintenance is required for prefab warehouse?
7.What is the typical cost of maintenance for a steel structure building?
8.What is the insulation and energy efficiency of prefab warehouse?
9.What are the most common applications for prefab warehouse?
10.prefab warehouse What is the average lifespan of a steel structure building?
11.Can prefab warehouse be expanded or modified in the future?
12.Are prefab warehouse environmentally friendly?
1.How do the construction time and labor costs for prefab warehouse compare to traditional building methods?
Our prefab warehouse products undergo strict quality control to ensure customer satisfaction. Steel structure buildings typically require less time and labor costs than traditional building methods. Steel structures are typically pre-engineered and pre-fabricated, meaning that much of the work is done off-site in a factory setting. This reduces the amount of time and labor needed on-site, as well as the amount of waste generated. Additionally, steel structures are often easier to assemble than traditional building methods, which can further reduce labor costs.
2.How does the weight of a steel structure building affect site preparation and construction?
We pay attention to employee development and benefits, and provide a good working environment in order to improve the efficiency of employees and improve the quality management of prefab warehouse products. The weight of a steel structure building affects site preparation and construction in several ways. First, the weight of the steel structure must be taken into account when designing the foundation and other structural elements. The foundation must be designed to support the weight of the steel structure, and the soil must be able to bear the load. Additionally, the weight of the steel structure must be taken into account when designing the crane and other lifting equipment used to move the steel structure into place. Finally, the weight of the steel structure must be taken into account when designing the temporary bracing and other support systems used during construction.
3.What certifications do your products have?
Providing safety and quality steel structure systems, ZYM Team Group has a strong focus on manufacturing all major components of steel structure building ,we have 5 steel structure production lines. ZYM covers an area of more than 50,000 square meters, with excellent equipment, numerical control technology and high degree of automation. Our products are approved by PHI,TUV,BV,CE etc.
4.Do you offer service for installation?
We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede.
5.How do prefab warehouse compare in terms of sustainability and green building standards?
We have advanced production equipment and technology to meet the needs of customers, and can provide customers with high quality, low priced prefab warehouse products. Steel structure buildings are highly sustainable and green building standards compliant. Steel is a highly recyclable material, and steel structure buildings can be designed to be energy efficient and to reduce the amount of energy used in their construction. Steel structure buildings are also often designed to be flexible and adaptable, allowing them to be easily modified or expanded as needed. Additionally, steel structure buildings are often designed to be resistant to natural disasters, such as earthquakes and hurricanes, making them a safe and reliable choice for green building standards.
6.What type of maintenance is required for prefab warehouse?
We enjoy high authority and influence in the industry and continue to innovate products and service models. Steel structure buildings require regular maintenance to ensure they remain structurally sound and safe. This includes inspecting the building for signs of corrosion, checking for loose or damaged fasteners, inspecting the roof and walls for signs of wear, and inspecting the foundation for signs of settlement or cracking. Additionally, it is important to regularly inspect the building for signs of pests or other infestations, and to check for any signs of water damage.
7.What is the typical cost of maintenance for a steel structure building?
We pay attention to the transformation of intellectual property protection and innovation achievements. Your OEM or ODM order design we have a complete confidentiality system. The cost of maintenance for a steel structure building can vary greatly depending on the size and complexity of the building. Generally, the cost of maintenance for a steel structure building is between 1-2% of the total cost of the building. This cost includes regular inspections, painting, and repairs.
8.What is the insulation and energy efficiency of prefab warehouse?
We actively participate in the prefab warehouse industry associations and organization activities. The corporate social responsibility performed well, and the focus of brand building and promotion Steel structure buildings are highly energy efficient and can be insulated to meet the highest energy efficiency standards. Steel is a great conductor of heat, so it is important to use insulation to reduce heat transfer. Steel structure buildings can be insulated with a variety of materials, including fiberglass, cellulose, and spray foam. Steel structure buildings can also be designed to meet the highest energy efficiency standards, such as LEED certification.
9.What are the most common applications for prefab warehouse?
We have a good reputation and image in the industry. The quality and price advantage of prefab warehouse products is an important factor in our hard overseas market. 1. Warehouses 2. Industrial Buildings 3. Agricultural Buildings 4. Retail Stores 5. Offices 6. Aircraft Hangars 7. Churches 8. Garages 9. Sports Facilities 10. Carports
10.prefab warehouse What is the average lifespan of a steel structure building?
We have established long-term and stable partnerships with our suppliers, so we have great advantages in price and cost and quality assurance. The average lifespan of a steel structure building is between 50 and 100 years, depending on the quality of the materials used and the maintenance of the building.
11.Can prefab warehouse be expanded or modified in the future?
We operate our prefab warehouse business with integrity and honesty. Yes, steel structure buildings can be expanded or modified in the future. Steel is a very strong and durable material, so it can easily be modified to accommodate changes in the building's design or purpose. Steel structures can be expanded by adding additional steel components or by welding new steel components to existing ones. Steel structures can also be modified by cutting, welding, and bolting new components into place.
12.Are prefab warehouse environmentally friendly?
We are committed to providing personalized solutions and established long -term strategic cooperative relationships with customers. Yes, steel structure buildings are environmentally friendly. Steel is a recyclable material, so steel structure buildings can be disassembled and the steel reused. Steel is also a durable material, so steel structure buildings can last for decades with minimal maintenance. Steel structure buildings also require less energy to construct than other types of buildings, making them more energy efficient.