China high rise large span Steel Structure Warehouse workshop Factory manufacture With CE Certification
China high rise large span Steel Structure Warehouse workshop Factory manufacture With CE Certification
China high rise large span Steel Structure Warehouse workshop Factory manufacture With CE Certification
China high rise large span Steel Structure Warehouse workshop Factory manufacture With CE Certification
China high rise large span Steel Structure Warehouse workshop Factory manufacture With CE Certification
China high rise large span Steel Structure Warehouse workshop Factory manufacture With CE Certification
Price
US $30
Model
ZYM-01
MOQ
500 square meter

Item specifics

Name
China Steel Structure Warehouse workshop with CE
Key word
China steel warehouse workshop manufacture with CE
Material
Q235,Q345B,SS400,H type hot rolled steel
roof of steel structure workshop
Galvanized color sheet or sandwich panel
wall of steel structure workshop
Galvanized color sheet or sandwich panel
steel structure workshop door and window
Aluminium alloy and PVC
Application
workshop,warehouse,office,hotel,commerical,school
Certification
CE certification,ISO certification
delivery time
30 days after steel structure design confirmed
steel structure design softwaree
CAD,3D3S,3DMX,TEKLA

Review

Description


China high rise large span Steel Structure Warehouse workshop Factory manufacture With CE Certification 

This modern steel structure workshop was built in the year of 2008. Totally almost 8000sqm,double floors. 

The second floor is for office.| Steel Structure Buildings

prefab steel structure
workshop prefab house
Detail material informations are as follows:

1,The cladding system use rockwool sandwich panel,50mm thickness ,0.5mm thickness steel sheet ,

no need ventilation fan,roofing pitch requirement, is rockwool like the walls

2,Clients no need to provide and install transparent super carbonate skylight sheets.

3. For the steel structure building wall and second floor for office

a) Rockwool sandwich panel for the steel structure building wall.

b)Not all of the building is steel structure,from the ground 1m concrete wall,then steel structure wall system.

c)parapet wall in the roofing

d) the load for the second floor is 200kn/sqm.

e)supply steel decking floor


prefab workshop
prefab warehouse

4. For the door,

Two big special steel structure warehouse use rolling doors( electric type) on the sides with 5 meters hight,

their location requirements 2 on the side and one small 4m *3m in the left and right.

Also combined the steel structure type canony above the door 

5. For the windows

4m*2.5m windows surrounded both the ground floor and first floor on the front and back side.

3 big 1m*6m windows on each angel of the steel structure building wall.

All the windows are designed as low-e ,good insulation and noise protection special steel structure office use 

glass( 6mm+12mm+6mm).

6. All the sketch of steel frame, CAD drawings and 3D steel structure looks,all provided to clients before 

projects started.

So the clients know what will be the steel structure building looks like,before finish. 




Read More 


ZYM manufacturing 

For further information feel free to contact us

Item name
Specification
Material Parameter
Technical Treatment
Column
H shape,Box,steel pipe,Hot rolled sheet
Q235B,Q345B
Paint or Hot dip galvanized
Beam
H shape,steel Truss,Hot rolled sheet
Q235B,Q345B
Paint or Hot dip galvanized
Bracing
Steel rod,Steel pipe,Angle steel
Q235B,Q345B
Purling
C or Z shape, purling Thickness:1.8mm~3.0mm
Q235B,Q346B
Hot dip galvanized
Wall and roof panel
EPS,Rock wool,Pu,Glass wool  Sandwich panel or Single sheet.
Steel T=0.426~0.8mm,insulation T=50~150mm
Alu-zinc 150g, Fluorocarbon paint
Door
Sliding or rolling door
Steel or Aluminum sheet,T=1.0~1.5mm
Paint or Hot dip galvanized
Window
alloy-Glass,Aluminium alloy-shutter
T=1.0~2.0mm
Alloy
Lighting panel
FRP, T=1.5mm or T=1.8mm
Coefficient of thermal expansion:2.2x10-5/cm/cm/℃
Light transmittance 85%
Ventilator
Turbine ventilator, and electric type
Steel,stainless steel,PC
Paint or Hot dip galvanized,304
Gutter
Galvanized or stainless steel plate
T=2.0mm
Hot dip galvanized,304
Downpipe
PVC pipe,Color steel pipe T=0.5mm
Φ110,160,200
Paint
Bolt
Ordinary, high strength
10.9S,4.8s
Hot dip galvanized
Anchor bolt
Steel rod M24,M27 M30
Q235B
                                  Steel columns                                              Steel Beams                                                   Tie bar 
                                    Knee Brace                                              Strutting  Piece                                           Casing  Tube
                                  C type purlin                                              Ztype Purlin                                                 Steel Sheet
                  Sandwich Panel                                                     Window                                                          Door 
                            Anchor Bolt                                      Strength Bolt                                            Natural  Ventilator
                                               We are different with full production system
Steel structure design is an important part of the whole steel structure construction. According to the Standard for Classification of Steel Structures,our steel building design is technologically advanced, economically,reasonable, safe and practical, and ensure quality.
2.EFFICIENT MANUFACTURE
Now we has 3 heavy steel production lines,2 light steel structure manufacturing lines. We has a complete production system of main steel structure,sub steel structure, purlin,structural accessories.
Strictly  Quality  Control 
In the process of designing, manufacturing and installing steel structures, we must insist the  most strictly sepcification of steel structure ,and make the procuct perfect .
Steel grade
GB/T 700-2006 Carbon Structural Steel Q235B(S235JR SS400 A36)
GB/T1591-2008 High Strength Low alloy 
Structural Steel Q345B(S355N,A50)
Profile
H beam GB/T11263-2010
Tube GB/T 6728-2002
Plate GB/T708.709
Angle GB/T706-2008
Fabrication&Finish
Fabrication GB50205-2001
HOT-galvanization GB/T13912-2002(ISO1461:1999)
3.FAST CONSTRUCTION
The steel structure building team has more than 20 senior project managers and registered construction engineers .The project manager responsibility system makes the steel structure perfect.
Size
11.8(L) * 2.13 (W) * 2.72 (H)
Weight
24T
Packaging Details
all of the steel structure columns and the beams ends will be packed by the blanket to protect them from the collision during the shipping in the container.
Size
11.8(L) * 2.13 (W) * 2.72 (H)
Weight
24T
Packaging Details
all of the purlin ends will be packed by the blanket to protect them from the collision during the shipping in the container.