Philippines Double floor Steel Structure Workshop drawing design With Warehouse And Office
Philippines Double floor Steel Structure Workshop drawing design With Warehouse And Office
Philippines Double floor Steel Structure Workshop drawing design With Warehouse And Office
Philippines Double floor Steel Structure Workshop drawing design With Warehouse And Office
Philippines Double floor Steel Structure Workshop drawing design With Warehouse And Office
Philippines Double floor Steel Structure Workshop drawing design With Warehouse And Office
Model
ZYM1

Review

Description

steel structure warehouse

                             How to build a double story steel structure workshop with warehouse and office?

                                                -Philippines 15000sqm chemical production zone

Philippines steel structure workshop :

Construction area: around 15000sqm 

Design: Double span prefabricated steel structure workshop building warehouse 

In front is steel structure workshop with high level

Use:Workshop and warehouse all used for chemical product

Insulation: sandwich panel with skylight


Prefabricated workshop


 






2.0 STEEL STRUCTURE METALWORK 

2.1 GENERAL 

Metal work shall be fabricated carefully and accurately to ensure compliance with design and performance requirements, using types and grades of metal as specified for the purpose. The finished work must be free from distortion and cracks. Test certificates should be provided for quality assurance of the metal works supplied. | cheap warehouse

2.2 MATERIAL QUALITY 

Shape of steel shall be precise and straight and free of injurious scratches and rust. Metal work shall be fabricated carefully and accurately to ensure compliance with design and performance requirements, using types and grades of metal as specified below; 
All structure members- Hot rolled universal section. 
Steel Grade- Grade 43 
Steel Strength – 275N/mm2 
All Steels to Conform to BS 5950 

2.3 BOLTING 

Bolts shall be of sufficient length to have at least one complete thread projecting beyond the outer face of the nut when tightened up. Washers shall be provided in all cases. Where necessary, washers shall be tapered or otherwise suitable shaped to give the heads and nuts of bolts a satisfactory bearing. | prefab steel structure

2.4 PAINTING TO STEEL  

All steel metal shall be epoxy painted. 

3.0  WALL CLADDING AND ROOFING 

Wall Cladding and Roofing sheets shall be roll formed from not less than 0.5mm (nominal) thick cold-rolled steel coated with an Aluminium and Zinc Alloy (Zincalume). Wall Cladding and Roofing sheets should be pre-painted. Paint finish film thickness shall be 25microns of high durability polyester. 

Cladding and Roofing material shall be to the highest standards and codes of practice. 
The Supplier is responsible for providing Cladding and Roofing material that is completely watertight and corrosion resistant and able to withstand expansion extremes likely to be encountered with temperature fluctuations. The Supplier is to ensure that Cladding and Roofing will be able to withstand normal pedestrian traffic at occasional intervals without sustaining damage of any description. 

Read More 


+ Packing& Delivery 


 Erection




1.5 DEFECT & PROTECTION DURING DELIVERY


During Delivery all delicate workshop materials shall be carefully handled and stored under cover in a manner to prevent deformation and damage to the materials and to prevent rusting and the accumulation of mud, dirt or other foreign matter on the metal work.  