China prefabricated warehouse and steel structure construction process
- Model
- ZYM3
Item specifics
- Name
- Indonesia steel structure warehouse workshop
- Key word
- Indonesia steel structure workshop with office
- Design
- 3D max,CAD for steel structure frame
- Material
- Q235,Q345B,SS400 steel structure
- Foof
- Galvanized color sheet or sandwich panel
- Wall
- Galvanized sheet for steel structure workshop
- Place of project
- Indonesia steel structure workshop and warehouse
- Delivery time
- 30 days after steel structure drawing confirmation
- Package
- Steel structure frame pallet for 40HQ container
- Application
- workshop,warehouse,office,commercial bulding,shop
Review
Description
Project Name: Food Processing Steel Structure Workshop
This project consists of an auxiliary building and a factory building, with the main structural form being the steel structure of the factory building and the frame structure of the auxiliary building; Total construction area: 6930.36 square meters; Total construction period: 366 days; The engineering design is for industrial factory buildings._
#light steel building warehouse construction
#low cost industrial warehouse
Read More
+ Packing& Delivery