China prefabricated warehouse and steel structure construction process
China prefabricated warehouse and steel structure construction process
China prefabricated warehouse and steel structure construction process
China prefabricated warehouse and steel structure construction process
China prefabricated warehouse and steel structure construction process
China prefabricated warehouse and steel structure construction process
Model
ZYM3

Item specifics

Name
Indonesia steel structure warehouse workshop
Key word
Indonesia steel structure workshop with office
Design
3D max,CAD for steel structure frame
Material
Q235,Q345B,SS400 steel structure
Foof
Galvanized color sheet or sandwich panel
Wall
Galvanized sheet for steel structure workshop
Place of project
Indonesia steel structure workshop and warehouse
Delivery time
30 days after steel structure drawing confirmation
Package
Steel structure frame pallet for 40HQ container
Application
workshop,warehouse,office,commercial bulding,shop

Review

Description

steel structure warehouse

 Project Name: Food Processing Steel Structure Workshop

This project consists of an auxiliary building and a factory building, with the main structural form being the steel structure of the factory building and the frame structure of the auxiliary building; Total construction area: 6930.36 square meters; Total construction period: 366 days; The engineering design is for industrial factory buildings._prefabricated workshop